Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Sep 06, 2021     Right elevator skeleton/end ribs - (3 hours)       Category: Empennage
I assembled the right elevator skeleton, including getting the E703-E704 connected and clecoed to the E713 skin. Boy, what a dooooosy getting the 713 holes to line up with the rib holes, this took way way longer than it should have. The 714 lead weight was drilled and countersunk. Skin final ream, debarred and dimpled.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.